Wharf project of Xiaomangniu operation zone, Yancheng port

The 3rd stage wharf project of Xiaomangniuoperation zone, Xiangshui port area, Yancheng port is a"financing+EPC" project, which fully displays CIIO's ability inproject financing and equipment manufacturing. The project is located in thesouth bank of Guanhe River, Xiangshui, Yancheng. Construction content includes four50000DWT berths. The berth length is 900m and the design throughput capacity is8000000 t. Width of the wharf platform is 30m and the structure of beams andslabs on standing piles is used.